Cookie preferences
This website uses cookies, which are necessary for the technical operation of the website and are always set. Other cookies, which increase the comfort when using this website, are used for direct advertising or to facilitate interaction with other websites and social networks, are only set with your consent.
Configuration
Technically required
These cookies are necessary for the basic functions of the shop.
"Allow all cookies" cookie
"Decline all cookies" cookie
CSRF token
Cookie preferences
Currency change
Customer recognition
Customer-specific caching
Individual prices
Live-Chat (3CX)
PayPal payments
Saves accessibility settings
Selected shop
Session
Comfort functions
These cookies are used to make the shopping experience even more appealing, for example for the recognition of the visitor.
Note
Statistics & Tracking
Affiliate program
Conversion and usertracking via Google Tag Manager
Google Analytics 4 (Reichweitenmessung)
HubSpot (Marketing-Analyse)
Meta/Facebook Pixel (Werbung)
Track device being used
Instruction & Commissioning – DaDo Laser
€150.00 *
Artikel-Nr.: SW10963
Prices plus VAT plus shipping costs
Delivery time approx. 5 working days
Easy shopping
Secure SSL connection
Free hotline service
Shopping safely
Ready for the first weld point in 45 minutes. Step by step with the technician: By telephone... more
Product information "Instruction & Commissioning – DaDo Laser"
Ready for the first weld point in 45 minutes.
Step by step with the technician: By telephone or video call we guide you through the commissioning of your DaDo laser: connection of power, argon gas line and cooling water, filling and checking the cooling system, basic settings with function test, test run on a sample application – plus notes on safety, maintenance and optimal use.
Requirement: The device is unpacked, the argon cylinder and coolant are ready. After this you will operate your laser independently and safely.
Scope of services
| Service | Telephone / video instruction & commissioning |
| Duration | approx. 45 minutes |
| Content | Connections, cooling system, basic settings, test run, safety |
| Requirement | Device unpacked, argon + coolant ready |
Hint!
Hint!
Hint!